Breagh Gas Fields

px Group has been managing the Breagh Gas Fields since 2011 and has also been responsible for processing gas from the fields since 2013.

Phase 1, 2011 – 2014

  • Management of Breagh Gas Fields development from front end engineering design (FEED), design, construction and commissioning.
  • Integration into Teesside Gas Processing Plant (TGPP), a top tier COMAH facility, alongside live operational plant.
  • Preparation and management of all onshore planning, environmental and consent activities, land leases and access rights.
  • Management of two major EPC contracts.
  • px Group continues to operate the facility.

Phase 2, 2015 – today

  • Managing the engineering, design and construction of the onshore inlet gas compression system at TGPP and tie-ins to the existing plant.
  • Beach valve station at the offshore pipeline landfall.
  • Two 11km underground interconnecting pipelines to TGPP including a horizontal directional drill to enable crossing under the River Tees.
  • Challenging brownfield design and construction of a new gas reception facility, MEG regeneration, processing and condensate export facilities.
px Groupx Breagh Gas Fields Map